|
CLIENT:
|
Indiana
State Fair Commission
|
|
|
PROJECT
LOCATION :
|
Indiana
State Fairgrounds - south end of the Brickyard Plaza and
at the south end of Gate 12 Entrance, northwest track
tunnel and backstretch of track
|
|
PROJECT
DESCRIPTION :
|
SIX
GOALS WERE ACCOMPLISHED
|
|
-
Integration of trackside wall conforming to United
States Auto Club (USAC) Requirements
|
- Creation
of aesthetically pleasing gathering plazas
|
- ADA
accessibility to existing walk tunnel
|
- Onsite
utility availability for vendors
|
- Provisions
for storm sewer discharge
|
|
APPROXIMATE
CONSTRUCTION COST:
|
$
1,800,000
|
|
SERVICES
PROVIDED BY UNITED: |
All
engineering services — including funding coordination,
design survey, environmental assessment, site layout /
design, retaining wall design, detention pond design,
and construction
inspection
|
|